NEW 2025 July Soft Offer – Sugar ICUMSA 45 – UP to 25,000 Mt in monthly basis each – Origin Brazil – CIF basis
SCO – Sugar ICUMSA 45 RBU
Brazil
We have this offer open only for Few weeks with Outstanding Price & Conditions-
Product | Total Qty | Monthly Order | Destination Port | Value US$ / Mts |
Sugar ICUMSA 45
1 Month SBLC /MT760 w/ monthly MT103
|
300,000 | 25,000 | CIF- Basis | 420 |
Product | Total Qty | Monthly Order | Destination Port | Value US$ / Mts |
Sugar ICUMSA 45
LC w/ monthly MT103
|
300,000 | 25,000 | CIF- Basis | 450 |
Commodity: ICUMSA 45
Origin: Brazil
Packing: in 50 kg. net weight bags.
Inspection: SGS at loading port
Performance Bond: 2% (for SBLC and LC payments)
Insurance: 110%
Payment:
SBLC (MT 760):.
(SBLC) For one month Shipment, Transferable, Irrevocable, Unconditional, Confirmed, Assignable, Divisible, paid 100% at Sight from TOP 50 bank, with MT103 against shipping document
LC (MT 700): From TOP 50 bank, 100% at sight payments with MT103 against shipping document
Contract: Can start Annual Contract from July’2025
Specifications
ICUMSA 45 RBU attenuation index units
(Method#: 10-1978)
Polarization: At 20-degree C (99.80 % min)
Ash Content:0.04% max by weight
Moisture: 0.04%max by weight
Solubility: 100% dry and free flowing
Colour: Crystal Sparkling White
Granulation: Fine
Table Grade: Standard
Substance: Solid Crystal
Smell: Free of any odour, unusual or abnormal smells
Radiation: Normal internationally accepted limit without Presence of Cesium oriodine
So2:20mg/kg max
MagneticParticle:4mg/kg max
ReducingSugar:0.010%maxbyweight
Poisonous: Phytosanitary certificate
Sediments: None
MaxAS:0.5P.P.M.
MaxPS:2P.P.M.
MaxCU:1P.P.M.
MaxCD: 0.05P.P.M
LEAD CONTENT: Not more than 0.05%Maximum
Max HG: 0.01P.P.M
Max ZN: 3.0P.P.M
Bacillus per gram: Nil
PHOTOXIN:0.01
Crop year: most current available
2024/2025
PROCEDURES
- Seller issues SCO Soft Corporate offer signed & sealed
- Buyer issues LOI/RWA with full banking coordinates.
- Seller issues Draft Contract.
- Buyer signs the Draft Contract and sends it back to the Seller.
- Seller issues the final Contract to the Buyer.
- 5. Buyer’s bank issues and sends by swift the non-operative L/C 100% at sight to the Seller’s bank within 48 hours.
- Seller posts Performance Bond (PB) for the value of 2 % and LC becomes operative.
- Shipment begins. Buyer can perform a physical inspection together with SGS at the time of loading of product.
__________________________________________