2020 Soft Offer – Soybean # 2 GMO & NON GMO – UP to 150,000 Mt per month – Origin Brazil – US$ 365 Pmt & & 440 Pmt- CIF Main Ports China.
SCO – Soybean # 2 GMO & NON GMO
Brazil
We have the pleasure to inform you that our group has negotiated this excellent option related to Soybean # 2 from Brazil..
PRODUCT |
SOYBEAN # 2 |
Product Type |
GMO Grade #2 & NON GMO |
Product Origin |
Brazil |
Quality |
Soybean GMO & NON GMO |
Total Order Qty. |
UP to 1.800.000 MT – NON GMO UP to 600.000 MT- GMO
|
Monthly Order Qty. |
150.000 Mt NON GMO and 50,000 Mt GMO |
Contract Period |
12 Months |
Destination Port |
ASWP in China |
Packing |
Bulk |
Performance Bond |
2% issued by Seller |
Insurance |
110% Insurance. Paid by Seller |
Inspection |
SGS or equivalent. For Quantity & Quality |
Price/Ship Term |
CIF – ASWP in China |
PRICE |
US$ 365 per MT GMO with DLC, Irrevocable, Transferable or NON transferable issued from TOP 25 Bank, 100% at sight. US$ 440 per MT NON GMO with DLC, Irrevocable, Transferable or NON transferable issued from TOP 25 Bank, 100% at sight
|
ALL Certifications to Export to China in Rule >>
SISCOMEX – BRASIL
AQSIQ – Registro de Exportação de Açúcar para China)
MONSANTO COMPANY – Soja GMO para China
MOA – (China) Ministério de Agricultura da China
When accepting our offer, please send us an ICPO with proof of funds (RWA or BCL) and Import License.
SCHEDULE OF DELIVERY:
Shipments and delivery shall begin 25-30 days of receipt and confirmation of an operative financial instrument acceptable to the seller and issued within the stated time.
Start date will be determined by date of receipt and confirmation of bank payment by buyer to seller. The schedule of deliveries will be informed from the seller to the buyer, after the signature of contract.
SPECIFICATION:
Test Weight: 54 pounds per bushel
Protein: Min 35%
Moisture Content: Max 13,5%
Foreign Material: Max 2,0%
Oil Content: Min 18,5%
Splits 20% Max
Total Damage: 4%
Kernels: 3% Max
Free Fatty Acids: 1% Max
Discolored Seeds: 2% max
Quality Based on following Specifications
SALES PROCEDURE
- Seller issues SCO Soft Corporate offer signed & sealed
- Buyer issues LOI/RWA with full banking coordinates and permission for Soft probe.
- Seller issues Draft Contract.
- Buyer signs the Draft Contract and sends it back to the Seller.
- Seller issues the final Contract to the Buyer.
- 5. Buyer’s bank issues and sends by swift the non-operative SBLC or DLC 100% at sight to the Seller’s bank within 48 hours.
- Seller posts Performance Bond (PB) for the value of 2 % and document becomes operative.
- Shipment begins. Buyer can perform a physical inspection together with SGS at the time of loading of product.
_________________________________________________